We will soon begin repaving the main driveway outside the Yawkey, Menino, and Moakley buildings. Weather permitting, driveway closures are scheduled for the following weekends, from Friday at 8 p.m. through Sunday at 8 p.m., on the following dates: Sept. 19-21, Sept. 26-28, Oct. 17-19, and Oct. 24-26. 

Access Changes During Construction:

Pedestrian Access: Patients and visitors will be able to enter Moakley through the entrance on East Concord Street.    

Vehicle Access: Vehicular traffic should use the designated drop-off and pick-up area on East Concord Street or the 710 Albany Street Garage. Signage will indicate where metered parking has been blocked off to create a drop-off/pick-up zone (on E. Concord between Harrison and the Moakley side entrance). 

Learn more about our campus redesign. 

carolyn

I was visiting my older son in Florida when I felt a lump. I told myself I’d get it checked out when I got home, but I didn’t. Then one Sunday, I noticed all these little painful bumps in the same place as the lump. My younger son said, "Mom, that’s it, we’re going to the doctor."

When I heard I had Stage IV breast cancer, I felt bad I had let it get to that point, but Dr. [Naomi] Ko said, "It’s OK. You're at the best place and we’re going to take care of it." And they sure did! I cared for my mom when she got breast cancer at 81, and she had the same positive attitude that I do.
 

This story is told in Carolyn's, the patient's, own words.

View all BMC stories