We will soon begin repaving the main driveway outside the Yawkey, Menino, and Moakley buildings. Weather permitting, driveway closures are scheduled for the following weekends, from Friday at 8 p.m. through Sunday at 8 p.m., on the following dates: Sept. 19-21, Sept. 26-28, Oct. 17-19, and Oct. 24-26. 

Access Changes During Construction:

Pedestrian Access: Patients and visitors will be able to enter Moakley through the entrance on East Concord Street.    

Vehicle Access: Vehicular traffic should use the designated drop-off and pick-up area on East Concord Street or the 710 Albany Street Garage. Signage will indicate where metered parking has been blocked off to create a drop-off/pick-up zone (on E. Concord between Harrison and the Moakley side entrance). 

Learn more about our campus redesign. 

 

“Our center provides comprehensive care to people with multiple sclerosis. It’s a wonderful collaboration of specialists who share information and as a result a patient’s well-being is much better. In a way this is a one stop shop for the many needs a patient might have.” - Konstantin Balashov, M.D., Ph.D. Director of the Multiple Sclerosis Center

 

Recent News