Campus Construction Update Regarding Driveway Access to the Yawkey, Menino, and Moakley buildings.

We will soon begin repaving the main driveway outside the Yawkey, Menino, and Moakley buildings. Weather permitting, driveway closures are scheduled for the following weekends, from Friday at 8 p.m. through Sunday at 8 p.m., on the following dates: Sept. 19-21, Sept. 26-28, Oct. 17-19, and Oct. 24-26. 

Access Changes During Construction:

Pedestrian Access: Patients and visitors will be able to enter Moakley through the entrance on East Concord Street.    

Vehicle Access: Vehicular traffic should use the designated drop-off and pick-up area on East Concord Street or the 710 Albany Street Garage. Signage will indicate where metered parking has been blocked off to create a drop-off/pick-up zone (on E. Concord between Harrison and the Moakley side entrance). 

Learn more about our campus redesign. 

Overlapping sphincteroplasty is surgery to repair a damaged anal sphincter, the muscle that allows you to hold stool in your body. The external anal sphincter forms a ring around the anus and if damaged, the surgeon will reattached damaged ends and stitch them together to create a complete ring shaped muscle, restoring the proper shape.

Explore Departments