Campus Construction Update Regarding Driveway Access to the Yawkey, Menino, and Moakley buildings.

We will soon begin repaving the main driveway outside the Yawkey, Menino, and Moakley buildings. Weather permitting, driveway closures are scheduled for the following weekends, from Friday at 8 p.m. through Sunday at 8 p.m., on the following dates: Sept. 19-21, Sept. 26-28, Oct. 17-19, and Oct. 24-26. 

Access Changes During Construction:

Pedestrian Access: Patients and visitors will be able to enter Moakley through the entrance on East Concord Street.    

Vehicle Access: Vehicular traffic should use the designated drop-off and pick-up area on East Concord Street or the 710 Albany Street Garage. Signage will indicate where metered parking has been blocked off to create a drop-off/pick-up zone (on E. Concord between Harrison and the Moakley side entrance). 

Learn more about our campus redesign. 

During an ERCP, the gastroenterologist uses an endoscope, a long, thin, flexible tube with a light and camera at the end, through the esophagus, the stomach, and the first part of the small intestine, called the duodenum. Once the endoscope reaches the papilla, which is the opening of the common bile duct, the physician injects dye through these ducts, enabling x-rays to be taken. A physician may recommend an ERCP if the patient is experiencing abdominal pain or develops jaundice.