Campus Construction Update Regarding Driveway Access to the Yawkey, Menino, and Moakley buildings.

We will soon begin repaving the main driveway outside the Yawkey, Menino, and Moakley buildings. Weather permitting, driveway closures are scheduled for the following weekends, from Friday at 8 p.m. through Sunday at 8 p.m., on the following dates: Sept. 19-21, Sept. 26-28, Oct. 17-19, and Oct. 24-26. 

Access Changes During Construction:

Pedestrian Access: Patients and visitors will be able to enter Moakley through the entrance on East Concord Street.    

Vehicle Access: Vehicular traffic should use the designated drop-off and pick-up area on East Concord Street or the 710 Albany Street Garage. Signage will indicate where metered parking has been blocked off to create a drop-off/pick-up zone (on E. Concord between Harrison and the Moakley side entrance). 

Learn more about our campus redesign. 

This is when medications to treat cancer are injected directly into the blood vessels that feed a cancerous tumor.

Transarterial Chemoembolization (TACE): TACE injects chemotherapy coated beads directly into a tumor while also blocking off its blood supply. This allows a high dose of chemotherapy drugs to concentrate at the tumor site for a longer period of time while having little effect on the rest of the body.